Reactive power compensation in power supply systems. KRM-SES-SR
381 660 RUB
Ask a Question
KRM-SES-SR
Reactive power compensation in power supply systems. Manual design with stand
Delivery time is 8 weeks.
Commisioning is advisable
Reactive power compensation in power supply systems. Manual design with stand
Delivery time is 8 weeks.
Commisioning is advisable
More details
Need a consultation?
Our experts will answer any question.
Ask a Question
Description
The laboratory stand is designed to conduct a laboratory workshop in the disciplines Equipment of electric stations and substations, Steady modes of electric networks, Transmission and distribution of electric energy, Power supply of industrial enterprises, Compensation of reactive power in power supply systems, Optimization of work electric power networks.
- Study of the operating modes of the electrical load.
- Effect of load on the operating mode of distribution network.
- Series capacity module in distribution networks.
- Reactive power compensation with capacitor.
- Connection and tuning of controller of reactive power FCR-05.
- Compensation of reactive power using a controller of reactive power FCR-05.
- Reactive power compensation using a static thyristor compensator.
- Modules of: Power supply; Single-phase transformers; Power line; Series capacity; Adjustable active load; Adjustable inductive load; Sources of reactive power; Switch (2 pcs); Controller of reactive power; thyristor converter; Reactor; Power meter; Three-phase circuit.
- Laboratory table
- Set of connecting cables.
- Technical description стенда.
- Methodology instructions on how to perform the laboratory works
Specifications
Design style | stand design |
Type of control | manual design |
Dimensions, mm | 1540х1350х650 |
Weight, kg | 180 |
Voltage, V | 3х380 |
Power consumption, VA | 1000 |
Documents