Automation of electric power systems. AES-SK
489 760 RUB
Ask a Question
AES-SK
Automation of electric power systems. Stand design with computer.
Delivery time is 8 weeks.
Commisioning is advisable
Automation of electric power systems. Stand design with computer.
Delivery time is 8 weeks.
Commisioning is advisable
More details
Need a consultation?
Our experts will answer any question.
Ask a Question
Description
The laboratory stand allows you to study the principles of operation and settings of relay protection and automation devices, simulate work and create algorithms for microprocessor-based automatic control and protection devices.
Relay protection
- Current cutoff.
- Overcurrent protection of electricity transmission line with independent time delay.
- Overcurrent protection of electricity transmission line with voltage triggering.
- Overcurrent protection of electricity transmission line with limited dependent time delay.
- Protection from single-phase-to-ground short circuit.
- Series differential protect of power lines.
- Differential protection of transformer.
- Differential protection of bus bars.
- Automatic reclosing of electric transmission line.
- Automatic reclosing of bus bars
- Automatic transfer to back up supply connection.
- Automatic switching to back up of bus section breaker.
- Modules of: Power supply; Three-phase circuit; Power meter; Measuring; Single-phase transformers (2 pcs); Power line (3 pcs); Switch (4 pcs); Active load (2 pcs); I/O.
- PC.
- Laboratory table (2 pcs).
- Desk for PC.
- Software.
- Set of connecting cables.
- Technical description.
- Methodology instructions on how to perform the laboratory works.
Specifications
Design style | stand design |
Type of control | with computer |
Dimensions, mm | 2400х1350х650 |
Weight, kg | 190 |
Voltage, V | 3х380 |
Power consumption, VA | 750 |
Documents