Energy saving in power supply systems. ES-SES-SR
535 210 RUB
Ask a Question
ES-SES-SR
Energy saving in power supply systems. Manual design with stand
Delivery time is 8 weeks.
Commisioning is advisable
Energy saving in power supply systems. Manual design with stand
Delivery time is 8 weeks.
Commisioning is advisable
More details
Need a consultation?
Our experts will answer any question.
Ask a Question
Description
The laboratory bench is intended for conducting laboratory and practical classes in academic disciplines of the electric power industry in higher, secondary and primary vocational educational institutions.
- Study of factors affecting the magnitude of the loss of electric energy in distribution networks.
- Study of the transmission of electric energy in a radial distribution network.
- Study of the transmission of electrical energy in a ring network.
- Optimization of radial distribution network mode by series capacity.
- Optimization of radial distribution network mode by lateral compensation of reactive power using capacitor.
- Optimization of the ring network mode by means of reactive power compensation by a synchronous compensator.
- Study of effect of operating mode of the synchro generator on the value of electric energy losses in distribution networks.
- Modules of:
- Power supply;
- Inductive load;
- Multimeters (2 pcs);
- Active load;
- Speed meter;
- Measuring;
- Power meter;
- Excitation;
- Frequency converter;
- Unit;
- Single-phase transformers (2 pcs);
- Synchronization;
- Power line (3 pcs);
- Capacity load;
- Series capacity.
- Electric machine unit.
- Frame
- Set of connecting cables.
- Technical description.
- Methodology instructions on how to perform the laboratory works.
Specifications
Design style | stand design |
Type of control | manual design |
Dimensions, mm | 2540х1350х650 |
Weight, kg | 300 |
Voltage, V | 3х380 |
Power consumption, VA | 750 |
Documents