Wind energy system. VES-MR
150 760 RUB
Ask a Question
VES-MR
Wind energy system. Manual monoblock design
Delivery time is 8 weeks
Commisioning is not necessary
Wind energy system. Manual monoblock design
Delivery time is 8 weeks
Commisioning is not necessary
More details
Need a consultation?
Our experts will answer any question.
Ask a Question
Description
The laboratory stand is designed to study disciplines: "Alternative and renewable sources of electricity", "Wind power", "Wind power plants".
- Determination of characteristics of synchro generator.
- Study of electric and mechanical characteristics of synchro generator.
- Study of operation of autonomous wind energy system with battery and load included
- Wind unit.
- Monoblock of control system.Set of power cables and connection cables.
- Technical description.
- Methodology instructions on how to perform the laboratory works.
Specifications
Design style | monoblock design |
Type of control | manual design |
Dimensions, mm | 1250х550х550 |
Weight, kg | 50 |
Voltage, V | 220 |
Power consumption, VA | 350 |
Documents